Customization: | Available |
---|---|
After-sales Service: | 24/7 Service for You |
Warranty: | 2 Years |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make at Made-in-china.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Fuel Truck tank Semi Trailer of Oil / Fuel Tanker
Bitumen/Asphalt Tank Semi-trailer is used for transportation for Asphalt, Bitumen, Tar oil, Crude oil, Palm oil...
The tank body is covered by a thermal insulation layer/coat for heating prevention.
Heating pipe and Burner are optional for fluidization/liquefaction of the transport medium.
Type | 27,000 - 55,000 Liters Tar Oil Tank Trailer with heating Burner & Insulation coat | |
Usage | Hauling Tar Oil, Asphalt, Bitumen, Crude oil, Lub oil, Palm oil... | |
Weight | Tare Weight | Approx. 7- 10 Tons |
Loading capacity | Effective volume 27,000 - 55,000 Liters Liters, +5%-8% vapor space | |
Dimensions | Outside Dimension | 11000*2500*3900 mm (Final dimension depend on the final design drawings) |
Tank Body | Design/welding Technology |
Heavy duty and extra durability designed; T-shape main beam welding by automatic Submerged-Arc processes. |
Tank shell |
Material Q345B Carbon steel, End plate thickness 6mm, Tank shell thickness 5mm, Anti-wave plate thickness 5mm | |
Heating Pipe | 2 sets heating pipe inside the tank body | |
Thermal Insulation Coat | 100mm thickness Rock wool compressed to 80mm around tanker shell, Surface covered by Color coated board. | |
Discharge valve | 1 set 4 inch outlet valve with cam-in groove adaptor at rear | |
Emergency valve | 4 inch Aluminum alloy Pneumatic Emergency shut-off , 1 Set | |
Breathing valve | Stabilizing breathing valve, 2 Pcs Aluminum alloy | |
Thermometer | 1 Pc measurement range 0ºC~300ºC | |
Manhole | Euro Standard, Aluminum alloy, 2 Pcs, Diameter: 500mm | |
Catwalk | Unti-slip with Foldable handrail | |
Test | Hydrostatic test to 5 psi(35Kpa) on each compartment | |
OEM parts | King Pin | 3.5''(90#) bolts type king pin |
Landing Gear | 28 Tons manual operation with two speed | |
Axle | 3 axles * 13 tons, square axle Shengrun brand | |
Suspension | Heavy duty tri-axle suspension with equalizers, American design | |
Leaf Spring | 6 Sets 60# spring, 10 layers * 13mm thickness * 90mm width | |
Brake system | 6 double brake chambers; Wide brake pads, 45 Liters air tank; Reliable Automatic transformer Relay valve for ABS . | |
ABS | Equipped 4S/2M | |
Rim | 9.0*22.5 steel wheel rim, 12 Pcs + 1 spare | |
Tire | 12.00R22.5 Tubeless Tire, 12 Pcs + 1 spare | |
Accessories | Fire extinguisher | 2 Pcs *8 kgs fire extinguisher with box |
Ladder | Detachable ladder equipped at rear | |
Discharging Hose | Rubber hose with hose carriers, 2Pcs, 6 meters /each | |
Hose container | 2 Pcs Standard PVC Cylinder Rubber hose container | |
Rear&Side Guard | Side guard+Rear guard+Mud guard+ Anti Static device | |
Spare Tire Carrier | 1 set spare wheel carriers, including a riser. | |
Valve Box | One Pc steel Valve box with lock. | |
Tools Box | One piece steel tool box with lock. | |
Electrical | One unit of 24V 7-Pin ISO 1185 socket; LED light ( Standard rear light, side light, rear reflector, side light, side reflector etc.) |
|
Painting | Sand blasting before painting; one coats of epoxy zinc phosphate primer, anti-corrosion; two coats of finish painting; Polyurethane paint . Color optional. Logo and sticker as customer's requirements. |
1. What is your terms of shipment?
A: Generally, we ship our truck by ro-ro ship, bulk cargo vessel, container etc.
2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages before you pay the balance.
3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF
4. How about your delivery time?
A: Generally, it will take about 10 to 20 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
5. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery.
6: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with them,no matter where they come from.
We will provide you with quality service 24 hours a day.
If you have any problem after receiving the goods, we will solve it for you at any time!
Waiting for your contact
---------Doris Han